Frampton completed construction in November 2024 on a new 30-door terminal facility for Saia Freight in Macon, GA.
The Saia Macon, GA project is a new 13,400-square-foot facility that features an office, breakroom, training room, dispatch area, and a warehouse with 30
dock doors.
Owner: Saia LTL Freight Architect: Design 3 Architecture Type: New Construction Category: Logistics