Facebook Instagram LinkedIn

SAIA Louisville

Louisville, KY 37,458 SQ FT

Frampton completed construction in August 2024 on the demolition and expansion of a trucking terminal for Saia Freight in Louisville, KY.

The Saia Louisville, KY, project involved the demolition of an existing structure and the construction of a new facility on the 12.9-acre site. The result is a 37,458-square-foot pre-engineered metal building, featuring 75 dock doors, a ramp, and two office areas.

Owner: Saia LTL Freight
Architect: B&T Design and Engineering

Related Projects

ODFL Pendergrass, GA

Logistics

Pendergrass, GA

View Project
View Project

Cambria Hotel & Suites Greenville

Multi-Unit, Hospitality

Greenville, SC

View Project
View Project

SEFL Mt. Crawford

IndustrialLogistics

Harrisonburg, VA

View Project
View Project